NEW DATA CENTRE AT RUGBY SCHOOL INSTALLS ECOCOOLING
Rugby School, the founding home of the game Rugby Union, has installed an EcoCooling system in it’s new ‘state of the Art’ data centre.
The system consists of a floor mounted cooler and a wall mounted extraction fan, linked to an internal control system.
The system was specified and designed by the market leading Data centre fit out company, Comms Room Services Limited, who constructed and delivered the facility for Rugby School.The system provides over 35KW of cooling to the...
GREEN COOLING FOR NEW FACTORY FOR POLYFLON
When Polyflon wanted to cool their new factory in Eccleshall they approached Celsius to provide the best most economical method of cooling.Air conditioning would have been more expensive to install and also far more costly to operate, however, air conditioning would not have introduced fresh air tothe personnel within the area.
EcoCooling was the logical solution, it uses fresh cool ambient air and then cools this as required, it means the air for the personnel is far healthier and the EcoCooli...
RECYCLING COMPANY COOLS ITS EMPLOYESS USING THE GREENEST FORM OF COOLING
When Careys waste recycling wanted to cool one of their picking stations in their recycling centre at Wembley, north London, they approached Celsius.
They were initially looking at installing air conditioning; the room is within a large warehouse which is full of discarded rubbish waiting to be recycled. As the rubbish is decomposing there is a tremendous amount of heat released and this means that the whole area is very warm, dusty and dirty.
Air conditioning would have been more expensive to...
MAIN PRODUCTION AREA COOLING FOR BUTCHERS PETFOOD
Following the success of the installation of 7 no. EcoCooling evap coolers in the ‘Wet box’ production area at Butchers Petcare (where the actual product wascooked, minced and canned), they then wanted to cool the main production area, this was an area the size of 3 football pitches, incorporating a packing area, warehouse area and a despatch area.
This area regularly reached temperatures of over 35Co in the summer months and made normal working almost impossible. The solution was t...
SHEFFIELD CHILDRENS HOSPITAL HAS GREENEST DATA CENTRE IN THE NHS
Sheffield Children’s Hospital has the lowest PUE of any Data centre in the NHS after installing 6 EcoCooling systems in their new ‘state of the art’ Data centre in Sheffield city centre.
The Data Centre was constructed on top of the existing 5 story Sheffield Children’s hospital, using a light weight construction, the EcoCoolers were installed around the periphery and the fresh filtered cool air is ducted under the floor into the cold aisles.
The warm air is then extrac...
ABERYSWYTH HEAD OFFICE DATA CENTRE ECOCOOLING SYSTEM WILL PAY FOR ITSELF IN UNDER 2 YEARS
Aberystwyth Council have fitted 2 Celsius EcoCooling units and 2 Celsius extraction fans to their head office Data Centre and their electricity usage figures for the first couple of months of use indicate that it will pay for itself in under 2 years.
The area was previously cooled using 2 standard DX CRAC systems providing nearly 50KW of cooling and costing many thousands to operate and maintain.
Initial running cost figures are showing an annual saving of over £17,500.00 pa, they are al...
LHASA USE ECOCOOLING IN THEIR NEW DATA CENTRE
Celsius have recently installed an EcoCooling system for Lhasa Limited in Leeds, Lhasa Limited have recently moved to a Leeds city centre office block and we have recently install a full EcoCooling system in their purpose built Data Centre.
The whole installation will pay for itself in less than 18 months and help in lowering their Carbon footprint.
The EcoCooling system provides 30KW of cooling and will save over 60 tonnes of carbon per annum.
MORE ECOCOOLING FOR LEEDS MET UNIVERSITY
Leeds Met Uni have recently installed another system of EcoCooling in their UPS room adjacent to their Data Centre.
They had install a system of 9 no. EcoCoolers in their Data centre two years ago and this system has performed very well for them, saving a great deal of carbon and running costs.
As well as installing the EcoCooling we have also removed the existing air conditioning system and replaced this with a modern Mitsubishi wall mounted system to provide N+1 resilience for the Celsius Ec...
ENVIRONMENT AGENCY GO GREEN
The Environment Agency have recently installed a system of EcoCooling in their Data Centre in Reading, this will save over 60 tonnes of carbon emissions from their two CRAC units that usually cool the area.
We removed one large pane of glass and replaced this will a colour co-ordinated panel, fully weatherproofed and then passed the duct through this panel, the ducting was also colour co-ordinated.The whole installation will pay for itself in less than 18 months and help in lowering their Carbo...
ECOCOOLING REPLACES WINDCATCHERS AND PROVIDE REAL COOLING AT NEW LEISURE CENTRE
Telford’s newest school and leisure centre employed Windcatcher units in the Activity hall, however, after only 6 months of operation they proved to be largely ineffective. Warm humid air was infiltrating from the adjacent swimming pool area and making conditions in the Activity area unbearable.
Therefore, after using Celsius EcoCooling successfully at their Wellington Leisure centre they approached Celsius to design them an EcoCooling system for the Activity Hall. Celsius removed one of...
ECOCOOLING COOLS THE GYM AT TELFORDS LATEST LEISURE CENTRE AT NEWPORT
Telford’s newest leisure centre uses an EcoCooling system to provide low carbon cooling to the gym area.
After using Celsius EcoCooling successfully at their Wellington Leisure centre and their new school at the Abraham Darby Centre they approached Celsius to design them an EcoCooling system for the new gym at Newport.
The system also incorporates significant attenuation to provide cool quiet low carbon cooling to the area. Providing 35KW of cooling to the area for the use of only 1.7KW...
WARWICK HOSPITAL JOINS THE GREEN ECOCOOLING REVOLUTION
Warwick hospital have installed an EcoCooling system in their on site Data centre. The system replaces the 4 no. 10KW spilt air conditioning units currently used, each of these has a 32 amp electrical feed, compared to the 16 amp feed to the new EcoCooling system, this results in a saving to the hospital of over 90% on their current electricity bills.
This equates to a saving of over 50 tonnes of carbon, going some way to meeting their Carbon Reduction targets.