MHRA APPOVED HEATING AND COOLING SYSTEM

When Amethyst Group in Warwickshire started storing medicinal products they had to adhere to the MHRA regulations for both minimum and maximum temperatures across the 18 bay warehouse.They approached Celsius and we designed a suitable heating and cooling system, along with a full electronic temperature mapping system with internet access and email alert capability. Heating SystemThe warehouse already had 4 floor mounted 175KW gas fired heaters, but due to the high rack storage there would be a...

Top Private School Keeps Pupils Cool The Ecocooling Way

When it came to presentations day at Queen Ethelburgas school outside York all the staff and pupils used to dread it being a sunny day as they would feel like they were melting in the sports hall, as temperatures often used to climb into the thirties!! So they approached Celsius Design to provide a cost effective and green solution. The low carbon footprint answer was a system of 8 no. EcoCoolers and 8 no. Celsius extraction fans, all the equipment is roof mounted and also contains large attenu...

Mezzanine Floor Cooling At Lead Smelting Works

When Calder Lead built a mezzanine floor and put the wood working department on there they never realised how hot it would get in the summer months, Temperatures regularly reached 38Co. They then called in Celsius to help provide a cost effective way of cooling the area. EcoCooling evaporative cooling was the answer, one roof mounted unit and the cool air was ducted to an extra large discharge plenum to provide good coverage onto the mezzanine floor.Directly after installation temperatures on t...

Chill Your Beans!!!!!

When Masteroast of Peterborough required their Production area cooling they approached Celsius, the cooling system had to reduce the shop floor temperatures in both the Roasting area and also in the Packing Area, where temperatures used to regularly rise above 38Co in the summer months. The correct level of cooling was introduced using 4 no. Celsius high powered vertical discharge extraction fans and the important fresh filtered air was introduced using 4 no Celsius Wall Inflow units above and...

DURHAM COUNCIL INSTALL ECOCOOLING IN THEIR MAIN DATA CENTRE

Durham Council have fitted 12 Celsius EcoCooling units and 12 Celsius extraction fans to their Data Centre in Durham. The area was previously cooled using 4 standard DX floor mounted CRAC systems providing nearly 360KW of cooling and costing many thousands to operate and maintain. Each EcoCooler in this application is estimated to save over £9,000.00 per annum and over 60 tonnes of Carbon per annum. Celsius undertook the complete installation including power and water supplies with no d...

NEW DATA CENTRE AT RUGBY SCHOOL INSTALLS ECOCOOLING

Rugby School, the founding home of the game Rugby Union, has installed an EcoCooling system in it’s new ‘state of the Art’ data centre. The system consists of a floor mounted cooler and a wall mounted extraction fan, linked to an internal control system. The system was specified and designed by the market leading Data centre fit out company, Comms Room Services Limited, who constructed and delivered the facility for Rugby School.The system provides over 35KW of cooling to the...

GREEN COOLING FOR NEW FACTORY FOR POLYFLON

When Polyflon wanted to cool their new factory in Eccleshall they approached Celsius to provide the best most economical method of cooling.Air conditioning would have been more expensive to install and also far more costly to operate, however, air conditioning would not have introduced fresh air tothe personnel within the area. EcoCooling was the logical solution, it uses fresh cool ambient air and then cools this as required, it means the air for the personnel is far healthier and the EcoCooli...

RECYCLING COMPANY COOLS ITS EMPLOYESS USING THE GREENEST FORM OF COOLING

When Careys waste recycling wanted to cool one of their picking stations in their recycling centre at Wembley, north London, they approached Celsius. They were initially looking at installing air conditioning; the room is within a large warehouse which is full of discarded rubbish waiting to be recycled. As the rubbish is decomposing there is a tremendous amount of heat released and this means that the whole area is very warm, dusty and dirty. Air conditioning would have been more expensive to...

MAIN PRODUCTION AREA COOLING FOR BUTCHERS PETFOOD

Following the success of the installation of 7 no. EcoCooling evap coolers in the ‘Wet box’ production area at Butchers Petcare (where the actual product wascooked, minced and canned), they then wanted to cool the main production area, this was an area the size of 3 football pitches, incorporating a packing area, warehouse area and a despatch area. This area regularly reached temperatures of over 35Co in the summer months and made normal working almost impossible. The solution was t...

SHEFFIELD CHILDRENS HOSPITAL HAS GREENEST DATA CENTRE IN THE NHS

Sheffield Children’s Hospital has the lowest PUE of any Data centre in the NHS after installing 6 EcoCooling systems in their new ‘state of the art’ Data centre in Sheffield city centre. The Data Centre was constructed on top of the existing 5 story Sheffield Children’s hospital, using a light weight construction, the EcoCoolers were installed around the periphery and the fresh filtered cool air is ducted under the floor into the cold aisles. The warm air is then extrac...

ABERYSWYTH HEAD OFFICE DATA CENTRE ECOCOOLING SYSTEM WILL PAY FOR ITSELF IN UNDER 2 YEARS

Aberystwyth Council have fitted 2 Celsius EcoCooling units and 2 Celsius extraction fans to their head office Data Centre and their electricity usage figures for the first couple of months of use indicate that it will pay for itself in under 2 years. The area was previously cooled using 2 standard DX CRAC systems providing nearly 50KW of cooling and costing many thousands to operate and maintain. Initial running cost figures are showing an annual saving of over £17,500.00 pa, they are al...

LHASA USE ECOCOOLING IN THEIR NEW DATA CENTRE

Celsius have recently installed an EcoCooling system for Lhasa Limited in Leeds, Lhasa Limited have recently moved to a Leeds city centre office block and we have recently install a full EcoCooling system in their purpose built Data Centre. The whole installation will pay for itself in less than 18 months and help in lowering their Carbon footprint. The EcoCooling system provides 30KW of cooling and will save over 60 tonnes of carbon per annum.

MORE ECOCOOLING FOR LEEDS MET UNIVERSITY

Leeds Met Uni have recently installed another system of EcoCooling in their UPS room adjacent to their Data Centre. They had install a system of 9 no. EcoCoolers in their Data centre two years ago and this system has performed very well for them, saving a great deal of carbon and running costs. As well as installing the EcoCooling we have also removed the existing air conditioning system and replaced this with a modern Mitsubishi wall mounted system to provide N+1 resilience for the Celsius Ec...

ENVIRONMENT AGENCY GO GREEN

The Environment Agency have recently installed a system of EcoCooling in their Data Centre in Reading, this will save over 60 tonnes of carbon emissions from their two CRAC units that usually cool the area. We removed one large pane of glass and replaced this will a colour co-ordinated panel, fully weatherproofed and then passed the duct through this panel, the ducting was also colour co-ordinated.The whole installation will pay for itself in less than 18 months and help in lowering their Carbo...

ECOCOOLING REPLACES WINDCATCHERS AND PROVIDE REAL COOLING AT NEW LEISURE CENTRE

Telford’s newest school and leisure centre employed Windcatcher units in the Activity hall, however, after only 6 months of operation they proved to be largely ineffective. Warm humid air was infiltrating from the adjacent swimming pool area and making conditions in the Activity area unbearable. Therefore, after using Celsius EcoCooling successfully at their Wellington Leisure centre they approached Celsius to design them an EcoCooling system for the Activity Hall. Celsius removed one of...